When should an agreement change state?
Follow a maintenance agreement whose completion requires an inspection sign-off. Change the evidence and inspect the permitted transition in each case.
Scope my agreement workflowInteractive example · fictional records
Choose the inspection evidence
Agreement SC-08 · Inspection milestone
- Milestone
- Maintenance reported complete
- Inspection evidence
- Designated inspector signed
- Agreement state
- Milestone accepted
Record one confirmed transition
The signed inspection matches this milestone and the expected inspector. Replaying the same approval should refer back to the recorded transition.
Scope my agreement workflowWhat we can build with you
A rules specification, transition model and test cases for the parties that can approve, dispute or amend an agreement.
- Bring to discovery
- Bring one milestone, its required evidence, authorised roles and the process used when those parties disagree.
- How to test the pilot
- Replay a missing approval, a repeated approval and a dispute. Match each resulting state to an agreed business rule.
Implementation details and questions
Product and engineering teams with a defined asset, agreement or transaction lifecycle.
Design and implement contract logic around a defined transaction or asset workflow. Model permissions, edge cases and upgrade responsibilities alongside tests, deployment procedures and application integration.
- Controlled issuance and transfer rules
- Multi-party approvals and settlement workflows
- Contract-backed application features
Specify states and authority
Define transitions, permissions and invariant rules. Identify dependencies on external information and who is authorized to change the system.
A contract specification and threat modelImplement and test
Build contract logic and scenario tests alongside application integration. Exercise access violations, invalid state changes and relevant failure conditions.
Reviewable contract code and test evidenceDeploy under control
Prepare deployment scripts, verify configuration and document upgrade or emergency responsibilities. Arrange independent review when required by scope.
A controlled deployment and maintenance plan
Application and signing policy → contract interface → transaction execution → event indexing and reconciliation. External inputs and administrative permissions remain explicit trust boundaries.
- State and permission specification
- Contract implementation and tests
- Application and event integration
- Deployment and change procedures
Translate the business rules into an explicit state model, then test both expected transactions and the ways they can fail.
- Tests and code review do not establish that a contract is exploit-free. Independent audits are separately scoped and evidenced.
- On-chain actions may be irreversible; the operating and change model must reflect the selected design.
Bring to discovery
- Business rules and lifecycle states
- Target chain, interfaces and authority model
- Review, upgrade and operating requirements
Do you provide a security audit?
Engineering tests and review are distinct from an independent security audit. Any audit scope, reviewer and report must be agreed and identified explicitly.
Can contract rules change after deployment?
That depends on the architecture. Upgradeability, governance and migration are deliberate choices with trade-offs, not a universal capability.